200 Drum Screen Gold Selection Mining Equipment Whole Line

Product Details
Customization: Available
After-sales Service: Guiding
Warranty: One Year Expect Wearing Parts
Still deciding? Get samples of US$ 3500/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Gold Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
5
Year of Establishment
2017-05-26
  • 200 Drum Screen Gold Selection Mining Equipment Whole Line
  • 200 Drum Screen Gold Selection Mining Equipment Whole Line
  • 200 Drum Screen Gold Selection Mining Equipment Whole Line
  • 200 Drum Screen Gold Selection Mining Equipment Whole Line
  • 200 Drum Screen Gold Selection Mining Equipment Whole Line
  • 200 Drum Screen Gold Selection Mining Equipment Whole Line
Find Similar Products

Basic Info.

Model NO.
Y
Customized
Customized
Condition
New
Power Source
Electric
Automatic Grade
Automatic
Type
Steel-Making Equipment
Certification
ISO, CE, CCS
Capacity
2-40 T/Ht
Gold
Select
Design
OEM
Install
Guide or Send Engineer
Transport Package
Container
Specification
whole set
Trademark
SDSD
Origin
Shandong, China
HS Code
84742090
Production Capacity
500/Year

Packaging & Delivery

Package Size
570.00cm * 210.00cm * 220.00cm
Package Gross Weight
14500.000kg

Product Description

200 Drum Screen Gold Selection Mining Equipment Whole Line
Chapter 1 Overview
1..Design basis
Sand gold mine equipment design scheme
2. Design principles
(1). Adopt mature technology and equipment, the overall layout of gold mine equipment is reasonable, to achieve a reasonable matching.
(2). Under the premise of meeting the technological requirements, wear-resistant materials should be used as far as possible, and the principle of stable and reliable operation, simple operation and convenient maintenance of the equipment should be taken as the principle.
3. Design scale
The gold equipment is 200t/h, using the drum type gold unit.


200 Drum Screen Gold Selection Mining Equipment Whole Line
Gold selection process
Granular gold, flake gold and capillary gold were recovered by gold concentrator in gravity separation.
1. Design process
Gold selection process mud, screening, washing, enrichment, tail discharge, its process is as follows: the design of the gold processing process is: the ore material by the loader on the feed sand tray, through the high pressure water gun washing tank into the drum classification screen, more than 2cm ore material washed after go. 2 ~ 0.6cm of mineral materials in the classification screen after cleaning into the large particles of gold equipment to select large particles, 0.6cm below the mineral materials into the automatic washing machine, automatic washing machine to remove mud water, light sand, into the gold sorting machine for selection, and finally into the shaking bed further selection.
2. Main technical indexes of mineral processing design of sargent equipment
3. Placer gold raw ore quantity is 200t/h
4. The recovery rate is 90%

Chapter 2 The main equipment selection of sargent equipment
1. Main equipment selection principles
2. The selection of sargent equipment requires high efficiency, energy saving, reliable operation and easy operation.
3. When selecting and determining the specifications of the sand gold equipment, the equipment model should be unified by the public, so as to reduce the type and quantity of spare parts.
4. Main engineering equipment
This equipment is composed of structural frame, roller screen, electric control system, water supply system, centrifugal gold sorting machine and other accessories
200 Drum Screen Gold Selection Mining Equipment Whole Line
Chapter 3 Technical and economic analysis of sand gold deposit
A. Mining
1. Production capacity: 200t/h.
2. Mining method: land mining.
3. Drainage mode: artesian drainage.
B.Beneficiation
1. Raw ore mining capacity: 200t/h..
2. Technological process
Raw ore mining feeding - ore washing - roller screen screening - gold selection - smelting
3. Beneficiation design index
Gravity recovery rate: 90%.
Smelting recovery rate: 99%.
The overall recovery rate was 89.1%.
4. Water supply and drainage
Water consumption of the equipment is 200m³/h200 Drum Screen Gold Selection Mining Equipment Whole Line
Selected water 80m³/h.
5. Supply electricity
Power supply mode: generator
Total working capacity: 150KW.
6. Equipment requires personnel
3 mining workers, select 1, smelter 1, management 1.

Chapter 4. Working environment
1. Suitable range of the machine environment: summer temperature is not higher than 45 degrees Celsius, winter temperature is not lower than -10 degrees Celsius.
2. Mineral requirements: This equipment is suitable for more mud mine
3. The sand gold equipment is equipped with night lighting system, suitable for all-weather operation and continuous operation.
Gold selection part:
The machine adopts automatic washing and gold sorting machine to overcome the fixed chute of the phenomenon of hardening, greatly improve the recovery rate of gold ore dressing, dressing cycle is four hours, gold concentrate mineral rate is 1.5%, recovery rate is more than 90%. This machine has the advantages of compact structure, light weight, small installation elevation, simple operation, reliable work and easy maintenance.

The main function of automatic washing machine
Further remove the mud water, separate the light sand, and leave the heavy minerals in the automatic washing machine
The main function of the gold selection machine
This equipment is a gravity beneficiation equipment, mainly used for the recovery of monomer gold in sand gold and vein gold mines, is the best equipment to improve the recovery of gold.
Gold equipment 3D picture:200 Drum Screen Gold Selection Mining Equipment Whole Line
Item  Model  Qty Power Mark
Feeding large sand table 6*4.2*0.75 m 1 / /
Support 8*3.8*4.5 m 1 / /
Seat 8*0.7 m 2 / /
Hopper 3*4*2.5 m 1 / infundibulate
Chute 4*0.9 m 2 / /
Drum screen 8*2.2m φ1.5 1 11 kw /
Auto washing selector 4.5*1.35 m 2 2.2 kw include two belts
Gold classificator 80 2 one 11kw /
control and cable / 1 /  
Sewage pump 22 kw 2 22 kw for classificator
Sewage pump 22 kw 2 22 kw for drum screen and selector
water road / 1 / include many water torch
working ladder / 1 / /
structure material / / / H steel,square tube
cross-connecting hopper / / / 6mm steel 



200 Drum Screen Gold Selection Mining Equipment Whole Line200 Drum Screen Gold Selection Mining Equipment Whole Line200 Drum Screen Gold Selection Mining Equipment Whole Line200 Drum Screen Gold Selection Mining Equipment Whole Line

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier